March 05, 2005
Slice off the tops of all 3 stickers. |
|
 |
 |
|
March 05, 2005
As opposed to the Neon sides, you only need the TOP
of these Decals for the center part of the wall. |
|
 |
 |
|
March 05, 2005
Start with the Decal at the right of the Alcove.
Use the Right Wall unit to help with your alignment. |
|
 |
 |
|
March 05, 2005
Now grab the last 2 remaining Decals and apply them
to the Left side of the Alcove wall. |
|
 |
 |
|
March 05, 2005
Print out and grab the last 2 remaining decals. |
|
 |
 |
|
March 05, 2005
Take the Ceiling Neons and align them with the rear
wall. They should fit just right and match up with
the front Top decals. |
|
 |
 |
|
March 05, 2005
Now place your Computer terminal Decal to the back
wall of the Alcove. |
|
 |
 |
|
March 05, 2005
We need side support to keep the unit from tipping
over so cut out 2 identical pieces of foamcore.
Measure 15.5 X 5.5 and cut out the pieces with your
Xacto Knife. |
|
 |
 |
|
March 05, 2005
Attach the first rectangle to the end of the wall
unit. |
|
 |
 |
|
March 05, 2005
And place the other onto the opposite side. |
|
 |
 |
|